Plan Studio · Core workflow

Draw Measured Cable and Conduit Routes

Connect devices point to point, create clean segmented turns, label cable types and estimate route lengths from the calibrated plan.

10 minutes5 stepsVisual + written guide

BEFORE YOU START

  • Calibrated plan dimensions
  • Placed equipment endpoints
  • Chosen cable or conduit type

WHAT THIS IMPROVES

  • Organized field pathways
  • Estimated cable quantities
  • Clear endpoint and equipment relationships
Open Plan Studio demo

WRITTEN WALKTHROUGH

Complete the workflow step by step.

01

Select the route type

Choose Draw Cable / Conduit and select Cat6, fiber, speaker cable, alarm wire, power, conduit or the appropriate custom pathway.

Why this mattersThe route type controls the line label, schedule and visual distinction on the finished plan.
PLAN STUDIO
AccountCompany profileDraw cable / conduit
TOOL SHOWNRoutes & connectionsDraw cable / conduit
PropertiesLabelQuantityNotesStatus
Routes & connectionsThe pointer identifies the exact control used in this step; the explanation stays outside the working area.
02

Start at the source device

Select the origin such as a camera, access point, speaker or reader, then begin the route at its connection point.

Why this mattersStarting from a real endpoint lets the plan explain how field devices return to the recorder, switch, rack, panel or amplifier.
PLAN STUDIO
AccountCompany profileDraw cable / conduit
TOOL SHOWNRoutes & connectionsDraw cable / conduit
PropertiesLabelQuantityNotesStatus
Routes & connectionsThe pointer identifies the exact control used in this step; the explanation stays outside the working area.
03

Create organized segments

Add intermediate corners along walls, corridors, trays or conduit paths instead of drawing an unrealistic direct diagonal line.

Why this mattersSegmented routes match practical installation pathways and reduce overlapping lines on dense plans.
PLAN STUDIO
AccountCompany profileDraw cable / conduit
TOOL SHOWNRoutes & connectionsDraw cable / conduit
PropertiesLabelQuantityNotesStatus
Routes & connectionsThe pointer identifies the exact control used in this step; the explanation stays outside the working area.
04

Finish at the destination

End the route at the NVR, PoE switch, control panel, rack, amplifier or other destination device.

Why this mattersA completed endpoint relationship supports both the cable schedule and the connected proposal equipment list.
PLAN STUDIO
AccountCompany profileDraw cable / conduit
TOOL SHOWNRoutes & connectionsDraw cable / conduit
PropertiesLabelQuantityNotesStatus
Routes & connectionsThe pointer identifies the exact control used in this step; the explanation stays outside the working area.
05

Adjust thickness and verify length

Change line thickness for visibility, review the calculated footage and add a reasonable field-service allowance when estimating material.

Why this mattersThe measured route is an approximate design quantity; installers still need slack, vertical transitions and service loops.
PLAN STUDIO
AccountCompany profileDraw cable / conduit
TOOL SHOWNRoutes & connectionsDraw cable / conduit
PropertiesLabelQuantityNotesStatus
Routes & connectionsThe pointer identifies the exact control used in this step; the explanation stays outside the working area.

COMPLETION CHECK

Confirm the result before moving on.

  • Route begins and ends on the intended devices
  • Corners follow a practical pathway
  • Cable type and approximate length appear in the schedule
  • Line thickness is readable without hiding the plan

NEXT TUTORIAL

Brand, Save, Export and Share a Finished Plan

Complete the title block, confirm the legend and cable schedule, export one clean PDF and attach the finished plan to the customer record.